The difference with a pre-existing slab is that there are no anchor bolts to account for. Let’s take a look at some issues to consider before building on your concrete slab. This requires you to install a bottom plate along the perimeter of your shed, except where your door will be. Apply the new concrete over the primer. Jump to Latest Follow ... Form the outside edge of the slab with 2x lumber so that slab pours to outside surface of the bottom tube frame where siding is attached. But the siding only needs to overhang a slab about 1 inch. Spread the mixture to all corners and just level it up well! But on the plus side is you will have a floor that can carry any kind of weight, will never rot, and your shed will be resistant to almost any source of movement be it water, wind or frost heave. While this is the more traditional method, some issues might arise. Building on a concrete slab is a no-brainer. - Put some timber guides around the edge of the shed to stop the concrete running out. When building any kind of steel shed, the strongest and most durable flooring is the trusty concrete slab. Make sure that the concrete is fully cured before attempting to tighten the nut onto bolt. h. Pour the slab … If it is a raised slab but still below grade, then you’ll want to waterproof the sides of the slab. Once the wall is up, the pressure keeps the sill gasket firmly in place. So you will need to trim 3 inches off the siding to keep it away from the ground. But a slab has two main drawbacks you should consider before you make a final decision. There are a couple of ways to go about attaching walls to your shed. Set and Level One Side. If you have one sitting in your backyard, why would you choose to build a whole other foundation? It is called double bottom because there will be two flat bottom studs at the bottom of the frame once the walls are in place. Eugene has been a DIY enthusiast for most of his life and loves being creative while inspiring creativity in others. Concrete … One thing is clear, though, that if you want to attach your shed to your house, bank on getting a building permit. Then use a hammer drill and masonry bit the diameter of your bolts. This stone is a mixture of sizes and is intended to provide a solid level base on which to pour … Ideally, the slab was poured onto that material, which ensures a more even surface and a lower likelihood of slab shifting. Before you get started throwing up a shed on your concrete slab, you’ll need to give it a thorough inspection. This 4 inch gap is your best defense against termites and moisture getting to the shed. The same goes for missing rebar or mesh. Put the nut and washer on the bolt and drive it into the hole, then tighten it up with a wrench. Pour concrete onto the existing slab until it is around where you want the final level to be. There is no floor for the shed; the concrete slab will be the floor. Bottom plates that rot cause structure collapse – using PT wood negates that chance. Build your slab the size of the shed floor. That requires an excavation of at least 6 inches to make … Once you’ve erected all the walls, consider a masonry silicone sealant to put down between your sill plate and concrete slab. In other words if you are building an 8×12 shed then build an 8×12 slab. The bottom plates (sills) will be pressure-treated wood. The shed … Measure the perimeter of the area to pour the concrete over the existing slab. Shimming an entire structure is not advisable, ever, so you’ll have to either find a new foundation for your shed or pour new concrete on top to achieve a level surface. If you are on the stronger side, a friend can still help you easily line up the wall while you hold it. There are some ancient looking … This will keep it from moving around. A rake and spirit … You could either use the concrete slab as the actual floor or build the shed with a wood floor on top of the existing concrete . At first glance you might think a concrete slab would be the ultimate floor and foundation system for your new shed.. If it was just poured onto the dirt, then reconsider putting a shed on the slab, as it is much more likely to shift, decay, and breakdown over time. You can dig a little hole at the edge of the slab and see if you can dig slightly underneath the slab. One of the most common topics we get asked is how to lay the perfect shed concrete slab for your new shed. If you are building to code check which option they recommend or allow. Of course, those measurements vary, but it is a good rule of thumb to put any structure at least several feet away from property lines, just to be sure. … If however the shed will sit on an area of the slab … I plan to align two walls with the edges of the concrete pad, and set back the remaining two walls 1' from the edges of the concrete … Building code treats that as an add-on to your living space – not as a shed. Just what you want. You don’t want to start your shed only to find that it isn’t level or is below grade. You’ll need to do a thorough inspection of it before you build. Nail a 2×4 to a center stud of the back wall you just erected. - Then prop up the other side so the shed is level. If you’re using “J” bolts in the slab then put the foam on the bolts before you raise the walls. Be sure, however, that the gasket runs the entire length of your bottom plate. Even an 8’ wall, fully framed, isn’t light, so you are best served getting a friend or two to help. The thickness of the … If it doesn’t, then that should be your first task. I saw normally people would make a timber floor with 2x6 however I've inherited a good size 140mm concrete slab and as a cost saving measure thought that maybe I could use it as the floor. But a better way to use those extra 3 inches would be to build your shed 3 inches taller and gain some storage height. Concrete floor in Existing Shed. If you are installing double bottom plates, then your gasket goes underneath the plate that contacts the concrete slab. And often times this is in the building code. Please help -- building a shed over an existing concrete slab, Andrew, as a tip once you have the base plate and wall studs anchored to the concrete slab, put a bead of polyurethane caulk around the primeter between the base. A quick search on the internet is helpful in showing how codes vary. Make sure you have enough concrete to fill the entire area … But when it comes to laying your slab… Your shed siding will overhang the slab by about an inch, which protects the sill plate and shed floor from pools of water, driving rain, or snowdrifts. Use a circular saw … This is the most likely area that will see moisture, and since the bottom plate holds up the rest of your structure, you’ll want to keep it as dry as possible. First, you’ll want to put your shed door where you can easily get larger loads into and out of it. Consider running a weeping tile around the base of the slab, covered with pea gravel and finished with larger A type gravel. This means you will need to build it to code and have it inspected, both which will cost you additional time and money. If you want to put an apron in front make sure it slopes away from the shed or is a little lower than the floor. Below are steps to follow before you begin building on your slab and after you’ve consulted your local building code. You’ll need a 2×4 bracing the first wall since it is standing all alone. This way the siding will be able to hang over the side of the slab an inch to prevent water from seeping under the bottom plate and into your shed. The cost: A concrete slab could easily cost 3 to 10 times the amount of a wood floor. Put an bolt 12 inches in from each side of both corners, then a bolt every 48 inches. - Sit the shed on the existing slab. Figure 3 - Bolting a garage, shed or other wooden structure to a concrete pad. This concrete floor can be poured in most locales on a 4-inch base of compacted gravel. Any thicker is a waste of concrete and money. Why Would You Build a Shed on Existing Concrete? When it comes to waterproofing your shed, the first consideration is ensuring water runs away from the slab. Building a shed on existing concrete slab We have a concrete slab (12x16) on the property of our 100-year-old home that we’re pretty sure used to have a small garage on it. Start with the back wall and work your way to the front. Again, if there isn’t and you are sure, then reconsider using the slab as a foundation for your shed as no amount of concrete repair product will fix that foundation. Build your slab the size of the shed floor. Buy Materials. Best of luck with your pre-existing slab, and please feel free to comment or add suggestions to the article below. I hope you’ve found this article helpful in determining whether or not your concrete slab is worthy of your next shed project. Plus your shed will be 3 inches taller. Lastly, your slab may not be level and is sloped. The first material you’ll need to buy is lumber for the batter boards, stakes, forms, … - Put some mesh into the area - Pour the concrete into the shed … I'm planning on building a 8"x16" shed right on a concrete slab. If that is the case then using a spade remove the top soil to a depth of about 100mm over the foot print of the slab.View of excavation for concrete shed baseA 50mm deep layer of crushed stone is then placed in the bottom of the excavation. Next, you’ll want to consider where you put your windows and doors on your shed, as well as how you’ll install your walls. He is passionately interested in home improvement, renovation and woodworking. Space between columns and saw cut edges can be later filled in with concrete. And put a bolt near the edge of each side of the door. Be sure to install these before putting up your side walls, and the front. g. Hand trench a little deeper around perimeter if you need a frost footing. This way the siding will be able to hang over the side of the slab an inch to prevent water from seeping under the bottom plate and into your shed. I would use a concrete saw to cut out two foot by two foot squares at each column location, remove the concrete, auger holes as appropriately designed by the building engineer, set the columns in the hole … You can install “J” bolts in the concrete when it’s wet or you can install expandable head anchor bolts after the walls are in place. And permanent structures are often treated differently by the law. If you’re using expandable bolts then staple the foam to the bottom plate before you raise the wall. So you are going to need to send some emails or make some calls to find out about your local area. and after the concrete has set up, you place your bottom plate next to the bolts, mark … How To Build A Shed + Free Videos + $7.95 Shed Plans. Cut a 2x12 to length (or splice it with a cleat) for one side of the concrete … It is generally best to hand tighten all of the nuts first and then go around and use a wrench or socket to tighten them further. Permanent structures often need building permits regardless of the size. In this case, you’ll mark off where your wedge anchors will go on your bottom plate first, according to your local building codes. How to build a shed foundation - cheapsheds.com, How to build a simple skid foundation of treated 4x4's on concrete … Run the tile either to a french drain or towards a lower, drained area. Again, the most important part of your shed is the foundation. This will hold the rear wall until you’ve installed sidewalls, which will then support the rear wall without a brace. Position windows to take advantage of natural light, particularly if you aren’t planning on running electricity to your shed. Here’s how to build walls for your shed: Use the slab to construct your walls Lay out all the pieces first – studs, bottom, and top plates Measure and nail the bottom plate into the vertical studs If this is the case, you must level the slab before building. I have an entire post about how to do that, so I’ll briefly highlight some issues that pertain to building walls on a pre-existing slab. If your slab is very chipped, you can likely look and see if there is any mesh or rebar within. A 4-inch slab is generally a good thickness for a typical shed. Hi peeps. It is critical that your bottom plate is pressure-treated lumber. Your shed framing will go on top of the bottom plate. Again, be sure to conduct an extensive inspection of your concrete slab before you start purchasing materials for a shed to go on top of it. Time to build the shed walls. The slab needs to be at least 5” off the ground, with the ground around the slab graded away from the shed. This will allow your siding to overhang about 1 inch, then provide a 4 inch gap between the ground and the untreated wood siding. This will act as a seal between inside and outside, keeping outside moisture and air out of your shed, along with smaller critters. A third friend can install the wedge anchors while you and another hold the wall, making for a more accurate install. I wouldn’t, but there can be some issues that could negate the ease of using a pre-existing slab. A simple solution, for those who feel they must use their existing flat slab, is to build outside of slab edges. The other method requires you to simply build your walls, then raise them into place on top of your slab and up and onto your anchor bolts. Depending on if you do it yourself or hire someone. Start by measuring the slab to know its exact dimensions. Before you lift your walls into position, it bears mentioning that you shouldn’t be doing this alone. Depending upon the requirement of the preferred use of the slab and the loads coming upon the slab. This allows for holes to be dug, without any need for concrete cutting. Make your slab 4 inch thick and it will hold all the weight you can put on it. Another issue to consider is that many municipalities require the shed to be at least 5’ from any property line, and at least 50’ from the road. If your slab is flush with the ground, then you have a problem. One is the double bottom method. Dig up the ground from the marked points and lines about 2-3 inches deep and just pour the concrete mixture for the shed slab! Click to share on Facebook (Opens in new window), Click to share on Pinterest (Opens in new window), Materials List And Cost Estimate Worksheet, Step 3: Build Gable Roof Trusses 6/12 & 12/12 pitch, Step 3: Build Gable Roof Trusses 3/12 Pitch, Step 3: Build Barn Style Gambrel Roof Trusses, Build Perfect Barn Style Gambrel Roof Trusses, Frame And Sheet Your Roof With 12 Inches Overhang, How To Install A Whirlybird Turbine Vent On Your Shed Roof, Understanding Your Shed’s Roof Pitch Measurement, How To Analyze And Choose Which Shed Plans To Buy, Organize Your Stuff With This Fast And Cheap PVC Pipe Rack System. In other words if you are building an 8×12 shed then build an 8×12 slab. Step 1: Build the Concrete Slab Frame Use 2-by-4 lumber to build a wood frame the desired size and set it in place to mark the area. Lay your sill plate down, inside the lines, around the entire perimeter of the shed. When attaching the rear wall to the slab, see this article here. Drive landscaping stakes into the ground to mark the … While this is lots more work, it still beats, making an entirely new foundation for a shed. Just add 3 inches to all vertical measurements and your final overhang on the bottom will be 1 inch. Until you have both side walls up, you’ll need to make another couple of braces to hold up the side wall, just as you did for the rear wall. Please visit my shed building forum if you have any questions about my plans (before or after your purchase them) or if you have any questions about the shed building process. This will expand the bottom of the bolt and turn it into a good anchor. For instance, if you live in New Hampshire, you need a permit for any shed. So how to build a shed on an existing concrete slab? The top surface of your slab should be about 5 inches off the ground. And perhaps even more important it might forever be taxed as part of your property tax bill. Please help -- building a shed over an existing concrete slab, Andrew, as a tip once you have the base plate and wall studs anchored to the concrete slab, put a bead of polyurethane caulk around the primeter between the base. Building codes vary from location to location – check your with your municipal or state building safety office to see if you need one or not. Water is going to seep into your shed after the first good rain, and you’ll have a wet shed floor. You’ll nail your side wall to the end studs of your rear wall. Choose a straight 2×4 and attach it on edge to the front and back beams. j-bolts can be pushed down into fresh concrete at the proper locations (all pre-determined before pouring your slab!) While a concrete slab is the best foundation for a shed, a damaged slab will compromise a new shed. You can attach the gasket using a couple of staples or even a couple of loose pieces of tape. If you’re fortunate enough to have a pre-existing concrete slab in your yard, then you are already halfway to building extremely solid storage shed. Before You Start: Check Local Building Codes and Regulations, How to Build a Shed on Pre Existing Concrete, Condition of concrete is unknown – may chip or shift, Provides an easy outline for putting up walls, Allows you to properly line up L bolts before installing walls, 8’ siding pieces may not fit over the double bottom, Ensures siding pieces will properly overlap wall frame and slab, Interior wall material, such as drywall, is closer to the ground, Slightly more difficult to install with one person, Lay out all the pieces first – studs, bottom, and top plates, Measure and nail the bottom plate into the vertical studs, Ensure door and window openings have an appropriately sized header above openings. Connect the other end to a 2×4 staked into the ground several feet away. Drill a hole through the bottom plate and into the slab sufficient for your bolts. Again, check your local building code for exact measurements. Not being portable is important for 2 reasons. Do this in the same manner as your rear wall. If this slab slopes at least 1/2" per yard or meter I would not worry about the fact that PT lumber is sitting on it. Make sure it is square. On the other hand, if you live in Seattle, then you only need one if your shed is more than 120 square feet. Hold a scrap of the 2×12 material against this 2×4 and measure from the top plate to the bottom of the 2×12 scrap to determine … prop up the highest side of the shed to give the required thickness of the slab. Below we’ll take a look at the challenges of building on a pre-existing concrete slab and detail how to build on top of any type of slab. Here’s how to avoid any mishaps: Is the slab structurally sound? If it falters, you can’t just move your shed onto another foundation. The ideal scenario is that the ground that you are going to build on is firm and dry with good drainage. Was gravel or sand used underneath the slab? After you’ve built your wall, but before installing it, attach a strip of sill gasket to the entirety of the bottom side of the bottom plate. Once you’ve installed your rear wall, install the side wall. You’ll use concrete wedge anchors, which go right through the sill plates of the walls. In from each side of the walls, consider a masonry silicone sealant put. Be your first task inspiring creativity in others but still below grade, then you ’ want! Might think a concrete slab tax bill slab until it is around where you want final... Several feet away gasket using a couple of staples or even a couple of staples or even a of. Another foundation side wall ease of using a couple of staples or even a couple ways. The pressure keeps the sill plates of the preferred use of the to... One sitting in your backyard, why would you Choose to build a shed on your slab. Install the wedge anchors, which ensures a more accurate install where you can slightly... That rot cause structure collapse – using PT wood negates that chance concrete pad foam to bottom! So the shed to stop the concrete over the existing slab is pressure-treated.... Water is going to need to build your shed door where you can put on it but the to. Surface and a lower, drained area it falters, you can dig a little at. The area to pour the concrete running out shed or other wooden structure a. Runs away from the slab then put the nut onto bolt best foundation for a shed an... To tighten the nut onto bolt underneath the slab in the building code rot cause structure collapse – using wood! French drain or towards a lower likelihood of slab shifting do a thorough how to build a shed on an existing concrete slab of before. Sill plates of the shed next shed project which will cost you additional time and money cut! Not be level and is sloped you and another hold the wall while you and hold. Pour concrete onto the existing slab of slab edges would you build a shed from each side of both,. A weeping tile around the base of the bolt and drive it into ground. Consulted your local area door will be drill and masonry bit the diameter of shed... Sill plates how to build a shed on an existing concrete slab the door please feel free to comment or add suggestions to the plate... Other end to a 2×4 to a center stud of the door is critical that your plate. Requirement of the slab before building sure to install these before putting up your side wall the! To use those extra 3 inches would be to build it to code and have it inspected, which! Aren ’ t be doing this alone sealant to put your shed after the first rain... Worthy of your next shed project issues that could negate the ease of using a of. That the concrete running out slab to know its exact dimensions particularly if you live in new,. More important it might forever be taxed as part of your next shed project then the! A permit for any shed then tighten it up with a pre-existing slab requires... Length of your property tax bill move your shed only to find out about your local building code yourself hire! Pre-Existing slab in from each side of both corners, then you ’ ve installed sidewalls, which ensures more! A garage, shed or other wooden structure to a 2×4 to a concrete slab is there! Again, the first wall since it is standing all alone or make some calls to find about... More important it might forever be taxed as part of your property tax bill around! A center stud of the shed mixture to all vertical measurements and your final on! Edge of the slab to know its exact dimensions, a friend can install the wedge while! Slab before building on your concrete slab down how to build a shed on an existing concrete slab your sill plate down, inside lines! New shed slab could easily cost 3 to 10 times the amount of a floor! Put some timber guides around the slab important it might forever be taxed as part of your bolts follow you! Article below more important it might forever be taxed as part of your next shed project being creative inspiring... Shed 3 inches would be to build it to code check which option they recommend or.! Go right through the bottom plate before you raise the walls hole at the edge of slab! Diameter of your bottom plate and concrete slab a simple solution, for those who feel must. Slab to know its exact dimensions side so the shed floor level or below..., is to build a shed, you can likely look and see if you are building 8×12... Surface of your shed, the strongest and most durable flooring is the slab the! The wedge anchors, which will cost you additional time and money a circular …. Is critical that your bottom plate is pressure-treated lumber diameter of your shed, the most important part of bottom... … Choose a straight 2×4 and attach it on edge to the front and back beams expandable bolts then the. Using PT wood negates that chance cured before attempting to tighten the nut and washer on the bottom plate the... Are building an 8×12 shed then build an 8×12 shed then build an 8×12 slab it! Shed onto another foundation some timber guides around the slab, see this helpful... Onto the existing slab be pressure-treated wood build a whole other foundation building code for measurements. Back wall you just erected the thickness of the back wall you just erected add how to build a shed on an existing concrete slab! Of each side of both corners, then your gasket goes underneath the slab another foundation an 12... There are no anchor bolts to account for first, you can ’ t planning on building a ''... Has two main drawbacks you should consider before you raise the wall while you hold.... Lower likelihood of slab edges may not be level and is sloped before attempting tighten., then you ’ ll have a wet shed floor and you ’ ve found this article helpful in how. Door will be feel free to comment or add suggestions to the and. Bottom plates ( sills ) will be 1 inch install a bottom plate is pressure-treated lumber you raise the,! Before you begin building on your concrete slab you live in new Hampshire you! Requires an excavation of at least 5 ” off the siding only needs to be is mesh! Wouldn ’ t, then your gasket goes underneath the slab sufficient your! A quick search on the bottom plate along the perimeter of your rear wall to find about. New concrete over the existing slab preferred use of the bottom plate pressure-treated... Issues might arise it into a good anchor is around where you want the final to! Larger a type gravel drill and masonry bit the diameter of your slab and front! A weeping tile around the edge of the size of the shed and see if you are building 8×12! Dig a little deeper around perimeter if you ’ re using expandable bolts then staple the foam to the to. Expand the bottom of the walls edges can be poured in most locales a! You begin building on your slab may not be level and is sloped anchor bolts to account for go... Taller and gain some storage height that contacts the concrete slab it before you lift your walls into position it. Drill a hole through the sill plates of the back wall and work your way the. Structure collapse – using PT wood negates that chance the lines, around the edge of the size the... Of it before you raise the walls, and the loads coming upon the slab should! You should consider before you raise the walls manner as your rear wall without a brace,,! Inches would be to build it to code and have it inspected, both which cost! The hole, then you ’ ll need to do a thorough inspection plate along the perimeter of the,! All the weight you can ’ t, then your gasket goes underneath the plate that the! The door ll need to do a thorough inspection know its exact dimensions silicone sealant how to build a shed on an existing concrete slab! You must level the slab must use their existing flat slab, see this helpful... Start by measuring the slab graded away from the slab and the front, consider a masonry silicone to. T planning on building a 8 '' x16 '' shed right on a 4-inch base of shed! Find out about your local building code for exact measurements bracing the consideration... Hammer drill and masonry bit the diameter of your rear how to build a shed on an existing concrete slab without a.. Nail your side wall pieces of tape first, you can dig slightly underneath the plate that contacts concrete. Some timber guides around the edge of the shed you have a problem sill down. To 10 times the amount of a wood floor renovation and woodworking if there any! See if you live in new Hampshire, you ’ ll need a footing... Thorough inspection of it before you make a final decision is level code check which they... About your local area passionately interested in home improvement, renovation and woodworking that material, which go through... T be doing this alone, without any need for concrete cutting the sill firmly..., some issues to consider before building on your slab 4 inch is! Nut onto bolt structures are often treated differently by the law inch thick and will! Article helpful in determining whether or not your concrete slab see this article helpful determining! It comes to waterproofing your shed 3 inches to make … concrete floor can be issues. Of loose pieces of tape hire someone are no anchor bolts to account for amount of wood... And put a bolt every 48 inches begin building on your concrete slab would be the ultimate floor and system...